Banks-power Cummins Motorhomes: (Diesel ’98 - 03 ISB 5.9L) Pow Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Für das Auto Banks-power Cummins Motorhomes: (Diesel ’98 - 03 ISB 5.9L) Pow herunter. Banks Power Cummins Motorhomes: (Diesel ’98 - 03 ISB 5.9L) PowerPack TLC & Stinger TLC systems w_OttoMind Module 5.9L, Class-A MHExcept Comon Rail User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 14
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INCLUDING STINGER TLC
WITH OTTOMIND™ ENGINE CALIBRATION MODULE
(LATE)1998-2003(ExCEpT COMMON RAIL)
CUMMINS ISB pOWERED CLASS A MOTORHOMES
THIS MANUAL IS FOR USE WITH SYSTEMS 49242 & 49284
Gale Banks Engineering • 546 Duggan Avenue • Azusa, CA 91702 • (626) 969-9600 • Fax (626) 334-1743
product Information & Sales: (800) 438-7693
Mon-Fri 6am–6pm, Sat 7am–1pm, PST
www.bankspower.com
©2009 GALE BANkS ENGINEERING 12/14/09 PN 96398 V.6.0
POWERPACK TLC
owners
manual
with installation
instructions
SYStem
®
®
Seitenansicht 0
1 2 3 4 5 6 ... 13 14

Inhaltsverzeichnis

Seite 1 - POWERPACK TLC

INCLUDING STINGER TLC™ WITH OTTOMIND™ ENGINE CALIBRATION MODULE(LATE)1998-2003(ExCEpT COMMON RAIL)CUMMINS ISB pOWERED CLASS A MOTORHOMESTHIS MANUAL IS

Seite 3 - INSTALLATION pROCEDURE

P.N. 9639811CHECKING ENGINE PERFORMANCEGo over the entire installation as a precautionary check to ensure that all clamps are tight, wiring

Seite 4 - Figure 2

PARTS LIST(LATE)1998-2003(EXCEPT COMMON RAIL) Cummins ISB Powered Class A MotorhomesCOMPONENT STINGER POWERPACKHIGH-RAM, Intake Casting -- 3BOOS

Seite 5 - Figure 3

This page left blank intentionally.

Seite 6 - Figure 4

This page left blank intentionally.

Seite 7 - Figure 6

For ease of installation of your Banks system, familiarize yourself with the procedure by reading the entire manual before starting w

Seite 8 - P.N. 96398

INSTALLATION pROCEDURETURBOCHARGER REMOVALLoosen the clamp that attaches the air inlet tube to the inlet for the turbocharger, and remove the ho

Seite 9 - Figure 7

Remove as many loose chips as possible from the exhaust manifold. A shop vacuum, small brush or fingers will help. Now remove the rag using a w

Seite 10 - Figure 8

provided.For Stinger installation, proceed to Step 26.HIGH-RAM INSTALLATIONDisconnect the hose joint at the inlet end of the factory intake casting.

Seite 11 - CHECKING ENGINE PERFORMANCE

wire. The Banks OttoMind will not function properly if installed incorrectly.Locate a black tap connector in the Banks kit. Squeeze an a

Seite 12 - PARTS LIST

Figure 5Figure 6P.N. 963987

Seite 13

Locate the gauge wire loom with the 4-pin connector in the Banks system. Plug the connector into the corresponding location on the O

Seite 14

Figure 7P.N. 963989

Kommentare zu diesen Handbüchern

Keine Kommentare