INCLUDING STINGER TLC™ WITH OTTOMIND™ ENGINE CALIBRATION MODULE(LATE)1998-2003(ExCEpT COMMON RAIL)CUMMINS ISB pOWERED CLASS A MOTORHOMESTHIS MANUAL IS
P.N. 9639810Figure 8
P.N. 9639811CHECKING ENGINE PERFORMANCEGo over the entire installation as a precautionary check to ensure that all clamps are tight, wiring
PARTS LIST(LATE)1998-2003(EXCEPT COMMON RAIL) Cummins ISB Powered Class A MotorhomesCOMPONENT STINGER POWERPACKHIGH-RAM, Intake Casting -- 3BOOS
This page left blank intentionally.
This page left blank intentionally.
For ease of installation of your Banks system, familiarize yourself with the procedure by reading the entire manual before starting w
INSTALLATION pROCEDURETURBOCHARGER REMOVALLoosen the clamp that attaches the air inlet tube to the inlet for the turbocharger, and remove the ho
Remove as many loose chips as possible from the exhaust manifold. A shop vacuum, small brush or fingers will help. Now remove the rag using a w
provided.For Stinger installation, proceed to Step 26.HIGH-RAM INSTALLATIONDisconnect the hose joint at the inlet end of the factory intake casting.
wire. The Banks OttoMind will not function properly if installed incorrectly.Locate a black tap connector in the Banks kit. Squeeze an a
Figure 5Figure 6P.N. 963987
Locate the gauge wire loom with the 4-pin connector in the Banks system. Plug the connector into the corresponding location on the O
Figure 7P.N. 963989
Kommentare zu diesen Handbüchern